Harmuti-Itanagar railway project nearing completion

http://zeenews.india.com/news/north-...on_805730.html

The Harmuti-Itanagar railway line project is nearing completion in Arunachal Pradesh.

"Construction of all minor bridges have been completed and the major ones are nearing completion while track linking is progressing, official sources said today.

Arunachal Pradesh had only 1.26 km of meter gauge from Balipara to Bhalukpong in West Kameng district built in 1990.

A new line from Harmuti to Itanagar was sanctioned in 1996-97, but the project was put on hold following a request by the state government. The state government approved the alignment from Harmuti to Itanagar in October 2006.
http://www.mediafire.com/download/vz..._2013-2014.pdf

Trains at a Glance (TAAG) 2013-2014
#602 Oct 16th, 2012, 01:17
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#602
Ramgarh-Ranchi road project hits rail hurdle

http://timesofindia.indiatimes.com/c...w/16816315.cms

Work on the ambitious 62-km-road project of Jharkhand Accelerated Road Development Corporation (JARDC) had to be stopped as the Railway Board is yet to issue the no objection certificate (NOC) for the same.

The project is a four-lane road connecting Ramgarh and Ranchi via Patratu railway station and three huge flyovers near three crossings at Ramgarh, Barkakana and Patratu railway stations. It may be noted here that any permanent construction near railway tracks without prior permission from the Railway Board amounts to a punishable offence under the Railway Act. The project has already received a go-ahead from the ministries of defence and forest and environment.
#603 Oct 16th, 2012, 01:17
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#603
Now shop on Shatabdi trains

http://www.ndtv.com/article/india/no...-trains-279426

Long journeys on premier Shatabdi trains are set to get interesting with the Railways deciding to introduce onboard shopping facility for a range of luxury products.

Perfumes, skincare products, handbags, watches and exquisite jewellery among other gift items will be available on sale in Shatabdi trains in Executive Class and Chair Cars, a senior Railway Ministry official said.

For chocolate lovers, trolleys showcasing luxury items will have a range of chocolates, the official said. Besides, there will also be souvenirs associated with railways on offer for Shatabdi passengers.
#604 Oct 16th, 2012, 01:18
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#604
Works on Gadag-Haveri route to begin soon

http://articles.timesofindia.indiati...undation-stone

Union minister of state for railways KH Muniyappa said that foundation stone will be laid for works on the five important railway routes including Gadag to Haveri in the state within three months. Speaking after participating at the inauguration function of the new railway station building here on Saturday, Muniyappa stated that Avengers to Tumakur, Whitefield to Kolar, Kudachi to Bagalkot, Rayadurga to Raichur are the four other four routes for which foundation stone will be laid.
#605 Oct 16th, 2012, 01:26
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#605
Special Trains between Pune and Hazrat Nizamuddin - Bookings open fro 01071 from 17.10.2012

http://www.cr.indianrailways.gov.in/...7CA2F791.web91

Railways have decided to run 2 special trains between Pune – Hazrat Nizamuddin to clear the extra rush of passengers during festival season. The details are as under:

01071 Special will leave Pune o*n Friday 19.10.2012 at 22.00 hrs and arrive Hazrat Nizamuddin at 03.10 hrs o*n Sunday.

01072 Special will leave Hazrat Nizamuddin o*n Sunday 21.10.2012 at 05.15 hrs and arrive Pune at 11.35 hrs o*n Monday.

Composition – One AC 2-tier, Two AC 3-tier, 12 Sleeper class, 5 General second class and 2 General second class cum Guard’s Brake vans.

RESERVATION: Bookings for 01071 will open from 17.10.2012.
#606 Oct 16th, 2012, 01:30
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#606
SPECIAL TRAIN TOWARDS NEW DELHI FROM BHUBANESWAR

http://www.eastcoastrail.indianrailw...89AC7792.web91

02281/02282 Bhubaneswar - New Delhi - Bhubaneswar weekly Special train will leave Bhubaneswar at 08.10 hrs o*n every Wednesday between 17th October 2012 to 26th December 2012 and will arrive at New Delhi at 06.05 hrs o*n the next days. In the return direction, this train will leave New Delhi at 13.00 hrs o*n every Thursday between 18th October 2012 to 27th October 2012 and will arrive at Bhubaneswar at 11.05 hrs o*n Fridays.

This train will have o*ne First Class AC Coach, o*ne AC-2 tier, Four AC-3 tier, Eight Sleeper Class, Two Guard cum Luggage Vans and o*ne Pantry Car in its composition having stoppages at Cuttack, Adra, Gaya, Mughalsarai and Kanpur between Bhubaneswar and New Delhi.
#607 Oct 16th, 2012, 01:33
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#607
ANOTHER SPECIAL TRAIN THROUGH ECoR

http://www.eastcoastrail.indianrailw...C20BFEF.web103

06336/06337 Kochuvelli-Guwahati-Kochuvelli weekly Special train leaving Kochuvelli at 17.00hrs o*n every Sunday from 7th October and arriving at Guwahati at 14.00hrs o*n the next Wednesday. This train will run upto 28th October 2012 from Kochuvelli to Guwahati. In the return direction, this train is leaving Guwahati at 12.15 hrs o*n every Thursday from 11th October and arriving at Kochuvelli at 06.50hrs o*n Sundays. This train will run upto 1st November 2012 from Guwahati to Kochuvelli.

This train will have o*ne AC-3 tier, Three Sleeper Class, Eleven General Second Class, Six Second Class Chair Car and Two Guard cum Luggage Vans in its composition having stoppages at Visakhapatnam, Vizianagaram, Srikakulam Road, Palasa, Brahmapur, Khurda Road, Bhubaneswar, Cuttack andBhadrak in ECoR jurisdiction between Kochuvelli and Guwahati.

SHIRDI BOUND SPECIAL TRAIN TO HAVE ADDITIONAL STOPPAGE:

In view to provide facilities to the commuters, East Coast Railway has decided to provide additional stoppage of Puri-Sainagar Shirdi-Puri Special Train at Khariar Road and Mahasamund.

02746 Puri-Sai Nagar Shirdi-Puri Special will leave Khariar Roat at 05.57hrs and Mahasamund at 06.32hrs towards Shirdi. In the return direction, 02745 Sainagar-Shirdi-Puri Special will leave Mahasamund at 19.07hrs and Khariar Road at 19.47 hrs towards Puri.
#608 Oct 16th, 2012, 01:34
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#608
NAVRATRA SPECIAL EMU TRAIN BETWEEN HAZRAT NIZAMUDDIN-PALWAL

http://www.nr.indianrailways.gov.in/...047A515B.web91

For the convenience of rail passengers during Navratra, Northern Railway has decided to run Navratra special EMU train no. 64096/64089 between Hazrat Nizamuddin- Palwal from 16.10.2012 to 24.10.2012.

The 64096 Hazrat Nizamuddin- Palwal Navratra special EMU train will depart from Hazrat Nizamuddin at 12.20 p.m. to arrive at Palwal at 1.40 p.m. While in the return direction the 64089 Palwal- Hazrat Nizamuddin Navratra special EMU train will depart from Palwal at 2.05 p.m. to reach Hazrat Nizamuddin at 3.15 p.m.

The 64096/64089 Hazrat Nizamuddin- Palwal Navratra special EMU train will stop at Okhla, Tughlakabad, Faridabad, Faridabad Town, Ballabhgarh & Asaoti stations enroute in both the directions.
#609 Oct 16th, 2012, 03:51
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#609
Festival special trains

http://www.ner.indianrailways.gov.in...-Pressnote.pdf

05027 Gorakhpur - Anand Vihar Terminus (Tri - Weekly) Special Express shall depart from Gorakhpur every Tuesday, Thursday and Saturday from 02nd October to 27th November, 2012 (25 Trips) at 23:20 hours to reach Anand Vihar Terminus the next day at 12:05 hours.

05028 Anand Vihar Terminus - Gorakhpur (Tri - Weekly) Special Express shall depart from Anand Vihar Terminus every Wednesday, Friday and Sunday from 03rd October to 28th November, 2012 (25 Trips) at 14:10 hours to reach Gorakhpur the next day at 05:35 hours.

Coach Composition: 1 - Third AC, 9 - Sleeper, 6 - General, 2 - SLR => Total 18 Coaches.

##
##

05101 Chhapra - Old Delhi (Unreserved) (Weekly) Puja Special Train shall depart from Chhapra every Sunday from 07th October to 25th November, 2012 (08 Trips) at 16:00 hours to reach Old Delhi the next day at 12:35 hours.

05102 Old Delhi - Chhapra (Unreserved) (Weekly) Puja Special) Train shall depart from Old Delhi every Monday from 08th October to 26th November, 2012 (08 Trips) at 14:00 hours to reach Chhapra the next day at 10:55 hours.

Coach Composition: 16 - General, 2 - SLR => Total 18 Coaches.

##
##

04023 Darbhanga - Delhi Sarai Rohilla (Bi -Weekly) Special Express (via Gorakhpur) shall depart from Darbhanga every Tuesday and Saturday on 15, 19, 22, 26, 29 October 02, 05, 09, 12, 16, 19, 23, 26 and 30th November, 2012 (14 Trips) at 15:00 hours to reach Delhi Sarai Rohilla the next day at 16:50 hours.

04024 Delhi Sarai Rohilla - Darbhangar (Tri-Weekly) Special Express (via Gorakhpur) shall depart from Delhi Sarai Rohilla every Monday and Friday from 03rd October to 28th November, 2012 (14 Trips) at 10:30 hours to reach Darbhanga the next day at 12:05 hours.

Coach Composition: 14 - Sleeper, 2 - SLR => Total 16 Coaches.

##
##

04602 Amritsar - Barauni (Unreserved) (Weekly) Puja Special Train (via Gorakhpur) shall depart from Amritsar every Sunday on 04, 11, 18 and 25th November, 2012 (04 Trips) at 12:35 hours to reach Barauni the next day at 17:50 hours.

04601 Barauni - Amritsar (Unreserved) (Weekly) Puja Special (via Gorakhpur) shall depart from Barauni every Monday from 05, 12, 19 and 26th November, 2012 (04 Trips) at 19:15 hours to reach Amritsar on Day 3 at 02:55 hours.

Coach Composition: 14 - Sleeper, 2 - SLR => Total 16 Coaches.

##
##

04642 Firozpur - Saharsa (Unreserved) Puja Special Train (via Gorakhpur) shall depart from Firozpur on 23rd and 24th November, 2012 (02 Trips) at 06:05 hours to reach Saharsa the next day at 16:10 hours.

04641 Saharsa - Firozpur (Unreserved) Puja Special (via Gorakhpur) shall depart from Saharsa on 24th and 25th November, 2012 (02 Trips) at 20:05 hours to reach Firozpur the next day at 22:25 hours.

Coach Composition: 14 - General, 2 - SLR => Total 16 Coaches.

##
##

04502 Ludhiana - Saharsa (Unreserved) Puja Special Train (via Gorakhpur) shall depart from Ludhiana on 27, 28, 30 and 31st October, 2012 (04 Trips) at 10:25 hours to reach Saharsa the next day at 16:10 hours.

04501 Saharsa - Ludhiana (Unreserved) Puja Special (via Gorakhpur) shall depart from Saharsa on 28, 29 October and 03 and 04th November, 2012 (04 Trips) at 20:05 hours to reach Ludhiana the next day at 22:25 hours.

Coach Composition: 14 - General, 2 - SLR => Total 16 Coaches.

##
##

05903 Chandigarh - Dibrugarh (Weekly) Puja Special Train (via Gorakhpur) shall depart from Chandigarh on every Friday on 05, 12, 19, 26 October and 02, 09, 16, 23 and 30th November, 2012 (09 Trips) at 08:40 hours to reach Dibrugarh the next day at 13:35 hours.

05904 Dibrugarh - Chandigarh (Weekly) Puja Special (via Gorakhpur) shall depart from Dibrugarh on every Sunday on 07, 14, 21, 28 October and 04, 11, 28, 25 November and 2nd December, 2012 (09 Trips) at 23:15 hours to reach Chandigarh on the third day at 06:15 hours.

Coach Composition: 1 - Second AC, 1 - Third AC, 10 - Sleeper, 4 - General, 2 - SLR => Total 18 Coaches.

##
##

09407 Lucknow Junction - Ahmedabad (Weekly) Puja Special Train (via Gorakhpur) shall depart from Lucknow Junction on every Monday on 04, 08, 15, 22, 29 October and 05, 12, 19, and 26th November, 2012 (09 Trips) at 11:35 hours to reach Ahmedabad the next day at 14:30 hours.

09408 Ahmedabad - Lucknow Junction (Unreserved) (Weekly) Puja Special (via Gorakhpur) shall depart from Ahmedabad on every Wednesday on 03, 10, 17, 24, 31 October and 07, 14, 21 and 28th November, 2012 (09 Trips) at 02:30 hours to reach Lucknow Junction on the third day at 07:00 hours.

Coach Composition: 2 - Second AC, 2 - Third AC, 7 - Sleeper, 6 - General, 2 - SLR => Total 19 Coaches.

##
##

05033 Gorakhpur - Mumbai Bandra (T) (Weekly) Puja Special Train shall depart from Gorakhpur on every Thursday on 04, 11, 18, 25 October and 01, 08, 15, 22 and 29th November, 2012 (09 Trips) at 08:25 hours to reach Mumbai Bandra (T) the next day at 18:05 hours.

05034 Mumbai Bandra (T) - Gorakhpur (Weekly) Puja Special Train shall depart from Mumbai Bandra (T) on every Saturday on 06, 13, 20, 27 October and 03, 10, 17, 24 November and 1st December, 2012 (09 Trips) at 05:10 hours to reach Gorakhpur the next day at 19:35 hours.

Coach Composition: 6- Sleeper, 10 - General, 2 - SLR => Total 18 Coaches.

##
##

04314 Bareilly - Darbhanga (Weekly) Puja Special Train (via Gorakhpur) shall depart from Bareilly on every Wednesday on 26 September and 03, 10, 17, 24, 31 October and 07, 14, 21 and 28th November, 2012 (10 Trips) at 07:05 hours to reach Darbhanga the next day at 03:30 hours.

04313 Darbhanga - Bareilly (Weekly) Puja Special (via Gorakhpur) shall depart from Darbhanga on every Thursday on 27 September and 04, 11, 18, 25 October and 01, 08, 15, 22 and 29th November, 2012 (10 Trips) at 10:30 hours to reach Bareilly on the third day at 05:50 hours.

Coach Composition: 1 - Second AC, 2 - Third AC, 10 - Sleeper, 3 - General, 2 - SLR => Total 18 Coaches.

##
##

05023 Gorakhpur - Pune (Weekly) Puja Special Train shall depart from Gorakhpur on every Thursday on 04, 11, 18, 25 October and 01, 08, 15, 22 and 29th November, 2012 (09 Trips) at 17:25 hours to reach Pune on the third day at 03:45 hours.

05024 Pune - Gorakhpur (Weekly) Puja Special Train shall depart from Pune on every Saturday on 06, 13, 20, 27 October and 03, 10, 17, 24 November and 1st December, 2012 (09 Trips) at 10:45 hours to reach Gorakhpur the next day at 20:20 hours.

Coach Composition: 1 - Second AC, 1 - Third AC, 8 - Sleeper, 6 - General, 2 - SLR => Total 18 Coaches.

##
##

05031 Gorakhpur - Lokmanya Tilak (T) (Weekly) Puja Special Train shall depart from Gorakhpur on every Saturday on 06, 13, 20, 27 October and 03, 10, 17, 24 November, 2012 (08 Trips) at 11:00 hours to reach Lokmanya Tilak (T) on the third day at 17:50 hours.

05032 Lokmanya Tilak (T) - Gorakhpur (Weekly) Puja Special Train shall depart from Lokmanya Tilak (T) on every Monday on 08, 15, 22, 29 October and 05, 12, 19 and 26th November, 2012 (08 Trips) at 12:50 hours to reach Gorakhpur the next day at 11:00 hours.

Coach Composition: 8 - Sleeper, 8 - General, 2 - SLR => Total 18 Coaches.

##
##

03131 Kolkata Chitpur - Gorakhpur (Weekly) Puja Special Train shall depart from Kolkata Chitpur on every Wednesday on 07, 14, 21 and 28th November, 2012 (04 Trips) at 11:25 hours to reach Gorakhpur) on the third day at 06:00 hours.

03132 Gorakhpur - Kolkata Chitpur (Weekly) Puja Special Train shall depart from Gorakhpur on every Thursday on 08, 15, 22 and 29th November, 2012 (04 Trips) at 13:55 hours to reach Kolkata Chitpur the next day at 08:55 hours.

Coach Composition: 1 - Second AC, 1 - Third AC, 10 - Sleeper, 2 - General, 2 - SLR => Total 16 Coaches.

##
##

05043 Gorakhpur - Jammu Tawi (Bi - Weekly) Puja Special Train shall depart from Gorakhpur on every Monday and Wednesday from 15th October to 28th October, 2012 (14 Trips) at 12:10 hours to reach Jammu Tawi on the third day at 10:25 hours.

05044 Jammu Tawi - Gorakhpur (Bi - Weekly) Puja Special Train shall depart from Jammu Tawi on every Tuesday and Thursday on 16th October to 29th October, 2012 (14 Trips) at 12:15 hours to reach Gorakhpur the next day at 14:15 hours.

Coach Composition: 11 - Sleeper, 8 - General, 2 - SLR => Total 21 Coaches.

##
##

01047 Lokmanya Tilak (T) - Gorakhpur (Weekly) Puja Special Train shall depart from Lokmanya Tilak (T) on every Friday on 19, 26 October and 02, 09, 16, 23 and 30th November, 2012 (07 Trips) at 13:20 hours to reach Gorakhpur the next day at 21:35 hours.

01048 Gorakhpur - Lokmanya Tilak (T) (Weekly) Puja Special Train shall depart from Gorakhpur on every Sunday on 21, 28 October and 04, 11, 18, 25 November and 2nd December, 2012 (07 Trips) at 08:25 hours to reach Lokmanya Tilak (T) on the third day at 17:50 hours.

Coach Composition: 1 - Second AC, 2 - Third AC, 11 - Sleeper, 3 - General, 2 - SLR => Total 19 Coaches.

##
##

01057 Lokmanya Tilak (T) - Muzaffarpur (Weekly) Puja Special Train shall depart from Lokmanya Tilak (T) on every Wednesday on 17, 24, 31 October and 07, 14, 21 and 28th November, 2012 (07 Trips) at 13:20 hours to reach Muzaffarpur the next day at 01:05 hours.

01058 Muzaffarpur - Lokmanya Tilak (T) (Weekly) Puja Special Train shall depart from Muzaffarpur on every Friday on 19, 26 October and 02, 09, 16, 23 and 30th November, 2012 (07 Trips) at 11:00 hours to reach Lokmanya Tilak (T) on the third day at 00:15 hours.

Coach Composition: 1 - Second AC, 1 - Third AC, 10 - Sleeper, 3 - General, 2 - SLR => Total 17 Coaches.
#610 Oct 16th, 2012, 03:59
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#610
Stoppage at Mandalgarh Station of Nizamuddin-Udaipur-Nizamuddin Mewar Exp.

http://www.nwr.indianrailways.gov.in...20151012-2.pdf

12963 Hazrat Nizamuddin - Udaipur Mewar Express will have a temporary stop at Mandalgarh Station from 15.10.2012 to 15.04.2013 for a period of six months. It shall arrive at Mandalgarh Station at 03:08 hours and shall depart at 03:10 hours.

12964 Udaipur - Hazrat Nizamuddin Mewar Express will have a temporary stop at Mandalgarh Station from 15.10.2012 to 15.04.2013 for a period of six months. It shall arrive at Mandalgarh Station at 21:44 hours and shall depart at 21:46 hours.
#611 Oct 16th, 2012, 04:04
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#611
Augmentation of trains on Temporary basis.

http://www.nwr.indianrailways.gov.in...20151012-1.pdf

18009/18010 Ajmer - Santragachi - Ajmer Weekly Express will be temporarily augmented with One General Coach from 19.10.2012 to 30.11.2012 ex - Ajmer and from 21.10.2012 to 02.12.2012 ex - Santragachi.

19711 Jaipur - Bhopal Express will be temporarily augmented with One General Coach on 16.10.2012 and 17.11.2012.
#612 Oct 16th, 2012, 04:05
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#612
Steps to Handle Passenger Rush and Special Checks During Pooja Holidays to Curb Malpractices in Mass Contact Areas

http://www.scr.indianrailways.gov.in...29108D06.web91

South Central Railway isrunning 132 Special Trains during the months of October and November, 2012 to popular destinations such as Secunderabad, Vishakhapatnam, Tirupati, Kakinada, Shirdi, Nanded, Aurnagabad, Chennai, Bangalore, Jaipur, Santragachi and Shalimar (Kolkata) and Jammu Tawi to clear extra rush of passengers during ensuing festival season. The details can be viewed on SC Railway Web-site:

www.scr.indianrailways.gov.in.Some of the existing trains have been augmented permanently with 61 additional coaches recently. Extra coaches are being attached on a daily basis to trains having long waiting list. Extra ticket counters are being operated at major stations o*n need basis to ease queues.

Apart from these special arrangements, the officials from Commercial, Vigilance and Security Departments of South Central Railway will carry out Special Checks during Pooja holidays to prevent irregularities in Booking / Reservation in order to ensure that bona-fied passengers are able to book their tickets with out facing any problem.

Raids on the premises of unauthorized and authorized travel agents with the help of local Police are being conducted in order to check / seize blocking of reservation under fictitious names and subsequent sale of transferred tickets. The checks will also concentrate on curbing the blocking of accommodation in Unreserved Coaches by Towel spreaders / anti social elements. Special efforts are also being made to detect fake tickets,forged tickets, resale of tickets, reuse of used tickets and also to detect misuse of Blank Paper Tickets, Extra Fare Tickets, Circular Tours Tickets and unsold tickets etc.

It is being ensured that Additional Coaches are logged in the Passenger Reservation System in time so that the waiting list is automatically updated. Statement of name change is drawn out on a daily basis and closely monitored to stop any misuse thereof. If there are any unusually high transactions by any particular Enquiry Cum Reservation Clerk, he/she is kept under close watch to detect any possible connivance with touts. In addition, the queues at the Reservation Counters are being monitored through Closed Circuit Television Cameras, wherever available, to prevent the activities of touts.

Arrangements are also made to man the Additional Coaches and Special Trains by Travelling Ticket Examiners so that in case any irregularity is detected responsibility could be fixed. South Central Railway gives wide publicity through Press Releases, Display Advertisements and website etc., to make the general public aware of the provision of Additional Coaches, Extra Coaches and Special Trains etc., enabling them to book their tickets in advance and not to fall into the hands of touts / agents.
#613 Oct 16th, 2012, 04:10
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#613
SPECIAL TRAINS BETWEEN TIRUNELVELI AND DADAR

http://www.sr.indianrailways.gov.in/...7DBF0B06.web91

To clear the extra rush of passengers, the following Special Trains will be run between Tirunelveli and Dadar.T.No.06746 Tirunelveli – Dadar Special will leave Tirunelveli at 07.10 hrs. o*n 17.10.2012, 24.10.2012 & 31.10.2012 (Wednesdays) and arrive Dadar at 16.25 hrs. o*n Thursdays. T.No.06745 Dadar – Tirunelveli Special will leave Dadar at 20.40 hrs. o*n 19.10.2012, 26.10.2012 & 2.11.2012 (Fridays) and arrive Tirunelveli at 09.45 hrs. o*n Sundays.The composition of the trains will be 1 AC 2-tier, 6 Sleeper Class, 6 General Second Class and 2 Luggage-cum-brake van coaches.The trains will stop at Kovilpatti, Virudunagar, Madurai, Dindigul, Karur, Erode, Tiruppur, Coimbatore, Palakkad, Shoranur, Kozhikkode, Kannur, Mangalore Jn., Udupi, Honnavar, Karwar, Madgaon, Thivim, Kankavali, Ratnagiri, Chiplun, Roha, Panvel and Thane.

Advance reservation for the above trains will commence o*n 16.10.2012.
#614 Oct 16th, 2012, 04:11
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#614
TEMPORARY STOPPAGE AT FEROK

http://www.sr.indianrailways.gov.in/...7DBF0B06.web91

To facilitate the HAJ pilgrims, the following trains will stop at Ferok railway station of Palghat division as given below.
Attached Images
11.jpg 
#615 Oct 16th, 2012, 04:12
Join Date:
Mar 2011
Location:
Kolkata
Posts:
3,795
  • dipyamanbasu is offline
#615
REVISION OF VEHICLE PARKING CHARGES AT MOORE MARKET COMPLEX

http://www.sr.indianrailways.gov.in/...7DBF0B06.web91

Due to the progress of CMRL work, the availability of vacant space at Chennai Central is getting reduced.In order to reduce the demand for parking, the parking charges have been revised as follows. The charges will be levied o*n a four hour slab system w.e.f. 00.00 hrs. o*n 16.10.2012 and not ‘per day’ basis.
Attached Images
11.jpg 
Reply

Similar Threads

Title, Username, & Date Last Post Replies Views Forum
About Special Trains Sep 16th, 2008 10:36 1 1495 Indian Railways
Kalka- Shimla Special Trains Aug 19th, 2008 02:35 27 18314 Himachal Pradesh
Special Trains to Goa Aug 4th, 2007 18:11 0 2870 Indian Railways
IS A/C On when a Coach is changed between trains Jun 4th, 2005 21:38 8 2486 Indian Railways


Posting Rules

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
Forum Rules»
Trackbacks are Off
Pingbacks are Off
Refbacks are Off
Thread Tools
Display Modes

Search Engine Optimization by vBSEO 3.3.2
© IndiaMike.com 2018
Page Load Success