Indian Railways - All about India Trains! The pride of IndiaMike!

Jammu to Kashmir Train Link - Jinxed ?


Reply
 
Thread Tools Display Modes
Old Jul 22nd, 2009, 16:27   #1
Maha Guru Member
 
Join Date: Jan 2007
Location: MUMBAI
Posts: 2,507
Jammu to Kashmir Train Link - Jinxed ?

The Train to Kashmir : Will it go straight ahead?
The national project constructing a rail link from Jammu to Kashmir has been derailed. The design is flawed, say some experts.
The new proposal has many benefits:

" The proposed new alignment from Katra to Banihal runs through a series of tunnels, which are 5-10km long
Avoiding landslide-prone mountain slopes, it cuts down the distance between Katra & Banihal from 125km to 67km
It crosses Chenab with a girder bridge standing on pillars 160m above the bed, while the present alignment envisages a mega arch bridge at 359m on an unstable gorge
The number of tunnels will reduce from 64 to 8 and bridges from 96 to 7
It also introduces a double line, which is needed for relief & restoration in the event of an accident or landslide
Estimated cost: Rs 9,600cr for the double line compared to Rs 10,500cr for the single line on the present meandering alignment".

The rail minister has taken no decision so far.
The project is stalled, and delayed indefinitely.

With inputs (" ") from the Times of India, Delhi
July 22, 2009
Indizen is offline   Reply With Quote
Reply



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd. LinkBacks Enabled by vBSEO 3.1.0
IndiaMike.com ©2001-2009

Syndicate this content on your website with rss or javascript data feeds.